Atom Tote Pack 20L 48125

$109.00
$109.00 $109.00
Shipping calculated at checkout.
Color Belay Blue BLYB
Size

Atom Tote Pack 20L 48125

An update to our classic Tamangito Pack, the Atom Tote Pack 20L is for those who want a smaller-fitting pack with removable tech storage that's capable of covering technical terrain. Fair Trade Certified™ sewn.

All fabrics, spacer mesh and static mesh are 100% recycled (stretch mesh is 84% recycled); body has a PFC-free DWR finish (durable water repellent coating that does not contain perfluorinated chemistry); pack volume is 20 litres.

Removable padded sleeve fits laptops up to 13" and has a secure zippered pocket to hold pens, cords and other desktop items to ease transitions from work to play. Front stash pocket holds small items and keeps valuable close at hand. 

Hydration hanger, pass-through access and breathable back panel are as ready for the trail as the daily commute.